The addition of PRIMER + TOP COAT to powder coating production lines always presents the same problems: increased cycle times, increased energy consumption, the risk of non-uniform coating due to
not optimal waiting times between coats, and reduced plant production capacity.
To overcome this limitation without affecting the overall footprint of the line or radically modifying the existing layout, ZIMETAL chose INFRAGAS:
DOUBLE-COAT PAINTING ON HEAVY DUTY CARPENTRY 24t/h
2MW installed with RHT, RADIANT HIGH TEMPERATURE
GUARANTEED PROCESS CONTROL
UNCHANGED LAYOUT
QUICK THERMAL PROCESS
INCREASE IN PRODUCTIVITY
COATING UNIFORMITY
ENERGY SAVINGS
CUSTOMER SATISFACTION
COMPETITIVE ADVANTAGES.
For more information: M. Fumagalli, “At Zimetal, the conveyor extension optimizes the efficiency of the painting plant without increasing its footprint,” in ipcm®
International Paint&Coating Magazine no. 94 (July/August 2025), pp. 108-112. https://www.ipcm.it/en/open/ipcm/2025/94/116-120.aspx